Tama WBS32RZS-MPB Starclassic Walnut/Birch Lacquer Molten Platinum Burst Set akustičnih bubnjeva
Brend: Tama
Kod proizvoda: 1220488
Brend: Tama
Kod proizvoda: 1220488
Tama WBS32RZS-MPB Starclassic Walnut/Birch Lacquer Molten Platinum Burst Set akustičnih bubnjeva
Discover a new dimension of sound with this stunning drum kit, engineered for the discerning drummer who demands both sonic complexity and visual elegance. The heart of this kit lies in its innovative hybrid shells, which masterfully combine the rich, low-to-mid frequency warmth of walnut with the focused attack and clear, high-end punch of birch. This unique fusion creates a sound that is both powerful and nuanced, offering a perfectly balanced tone that shines in any musical setting, from the studio to the stage.
Every detail is crafted for performance. The shells are equipped with legendary die-cast hoops, providing exceptional tuning stability and a crisp, articulate rimshot that cuts through any mix. To ensure maximum natural resonance, the toms are fitted with the Star-Cast Mounting System, which allows the shells to vibrate freely without any dampening from the hardware. The result is a pure, open tone with incredible sustain and projection.
Finished in a breathtaking Molten Platinum Burst lacquer, this kit is designed to capture the spotlight. The finish is deep, vibrant, and looks absolutely spectacular under lights. This 3-piece shell pack is more than just an instrument; it's a professional tool that provides the sound, reliability, and looks you need to elevate your performance.
Key Features:- Hybrid shells made from a combination of Walnut and Birch for a balanced, versatile tone.
- Die-Cast hoops ensure precise tuning and deliver a powerful, focused attack.
- The Star-Cast Mounting System enhances shell resonance and sustain.
- Comes equipped with professional-grade Evans drumheads right out of the box.
- Stunning Molten Platinum Burst lacquer finish for a premium look.
- Configuration: 3-piece shell pack (bass drum, rack tom, floor tom).
Serija
Starclassic
Broj slojeva
6
Број слојева бас добоша
7
Boja prema proizvođaču
Molten Platinum Burst
Materijal kućišta
Zemlja porekla
Kina
Dokumenti
Informacije o proizvođaču
Bezbednosna uputstva
Pogledaj uputstvo za upotrebu za detaljna bezbednosna uputstva za ovaj proizvod.